The demolition and reconstruction of part of an existing building, such as the wing of the building, or perhaps the conversion of an existing building (or part) to an annexe can not be zero-rated as the development of the annexe. Inside layout concentrates on The interior surroundings of the building, https://jaspereijhe.blogspothub.com/31913665/5-essential-elements-for-building-and-costruction